Technical Summary: Egbin Power
Egbin Thermal Power Plant was commissioned in 1986. Construction began in 1982, led by the Marubeni Consortium. This was a joint venture between Japan's Hitachi Company and Frances Bouygues. The commisioning was carried out under Ibrahim Babangida.
30 September 2026