Overview - Escravos Gas To Liquid Plant
Built to the south of Warri, Delta State - the Escravos Gas to Liquid Plant generates liquid fuel from natural gas.
Key Details
Pre-Feasibility Study: 1998
Frond End Engineering and Design: 2002
Construction Award: 2005
Plant Startup and Operaton: 2014
Capacity: 34,000 bpd of synfuel (naptha and diesel)
Technology Suite: Fischer Tropsch and Chevron ISOCRACKING
Feed Volume: 325 MMSCFD
Construction Contractor: JGC, KBR, Snamprogetti
Operator: Chevron Nigeria Limited, Nigerian National Petroleum Company, Sasol
8 October 2026
History of Escravos and the Plant
Starting from Warri, go east past the Forcados River. In about another 40 miles, you'll meet the Escravos River. It will eventually empty into the Bight of Benin. "Escravos" named by the Portuguese, means slaves. This was a major route in bringing Africans from the interior to the trafficked abroad.
The economic value of the river is persistent, as it is the location of the Escravos Gas to Liquid Plant. The major importance of which, utilized Fischer Tropsch synthesis to tranform Nigeria's amply natural gas resources into liquid fuel.
10 October 2026
References
8 October 2026